The simplest way to document assumptions and decisions in a data project is to keep a short decision record for every choice that changes your results: what the context was, which options you weighed, what you chose, and what impact it had. Each record should fit on one screen and be readable by a mentor in about two minutes. The template and a filled example below show exactly how to do that.
Why a data project needs written decisions, not just code
Most student data projects end with a notebook and a final accuracy number. What the notebook rarely shows is why rows were dropped, why a column was treated as a category, or why one metric was picked over another. Those choices often move the result more than the algorithm does.
When a mentor, examiner or interviewer asks “why did you do this?”, an answer from memory two weeks later is usually vague. A written record answers it in seconds and shows that you can reason about data, which is a skill separate from running code.
A decision record is different from a project report. A report describes what you did. A record explains why you did it, what else you could have done, and what changed because of it. It is also different from a code comment, which explains a line, not a choice.
What counts as a decision worth recording
Not every action needs a record. If you renamed a column for readability, skip it. Write a record when a choice could reasonably have gone another way and would change the numbers or the conclusion. Typical triggers in a data project:
- Scope choices: which question you are answering, which rows or time period you include.
- Cleaning choices: dropping, filling or capping missing values and outliers.
- Definition choices: how you define a target such as “churned customer” or “high-risk patient”.
- Feature choices: encoding, scaling, creating or removing variables.
- Split and validation choices: random split versus time-based split, cross-validation setup.
- Metric choices: accuracy, recall, F1, RMSE and why.
- Model choices: why a simple baseline was kept or a complex model rejected.
A useful rule: if you would feel uneasy being asked about it in a viva, record it.
Free 2-Week CareerSwami Internship
Online, 14 days, with a free offer letter and a free completion certificate once you finish the work. Check with your college that it fits your requirement before you enrol.
Assumptions versus decisions: keep them separate
An assumption is something you are treating as true without having proved it. A decision is a choice you made. They are linked, because most decisions rest on assumptions, but they need different handling.
- A decision is closed once made, though you can revisit it.
- An assumption stays open until you test it, so it needs a “how I would check this” note and a status.
Example: “Missing income means the customer did not report it” is an assumption. “Fill missing income with the median” is the decision built on it. If the assumption is wrong, for instance if blanks actually mean zero income, the decision is wrong too. Writing both lets a reader see the dependency.
The four-part decision record template
Copy this block into a text file, a notebook markdown cell or a shared document. Use one block per decision and number them in order (D-01, D-02 and so on).
DECISION D-__ | Date: __ | Status: Proposed / Accepted / Reversed
Title: (verb + object, e.g. "Drop rows with missing target")
1. CONTEXT
- Question or step this belongs to:
- What I observed in the data (with a number):
- Assumptions I am relying on (A-1, A-2...):
2. OPTIONS CONSIDERED
- Option A:
- Option B:
- Option C (or "do nothing"):
3. CHOICE
- Chosen option:
- Reason (one or two sentences, tied to the evidence above):
4. IMPACT
- Rows / columns / metric affected (before and after):
- Risk if an assumption is wrong:
- How and when I will check it:
- Where in the code: (file, cell or function name)
What each field is really for
| Field | What a good entry looks like | What a weak entry looks like |
|---|---|---|
| Context | States an observed number, such as “7.4% of rows have no age value” | “Data was messy” |
| Assumptions | Numbered, testable statements | Hidden inside the reasoning or missing |
| Options | At least two real alternatives, including doing nothing | One option dressed up as a choice |
| Choice and reason | Reason refers back to the context evidence | “Because it is commonly used” |
| Impact | Before and after counts or metric change | “Improved the model” |
| Check | A specific test and a day | “Will verify later” |
A filled decision record a mentor can audit in two minutes
The example below is illustrative. The dataset, numbers and results are invented to show the format; nothing here was run or measured on real data. Imagine a student predicting whether a loan applicant will default, using a table of 10,000 applications.
DECISION D-03 | Date: Day 4 | Status: Accepted
Title: Fill missing monthly income with the median per job category
1. CONTEXT
- Step: data cleaning, before train/test split
- Observed: 8% of rows (800 of 10,000) have blank monthly_income.
Blanks are concentrated in "self-employed" (62% of the blanks).
- Assumptions:
A-1: Blank means "not reported", not "zero income".
A-2: Income within a job category is skewed, so the median
is safer than the mean.
2. OPTIONS CONSIDERED
- A: Drop the 800 rows.
- B: Fill with the overall median.
- C: Fill with the median per job category, and add a flag
column income_missing = 1.
3. CHOICE
- Option C.
- Reason: Dropping would remove most self-employed applicants and
bias the sample. An overall median ignores that incomes differ by
job type. The flag keeps the "was missing" signal.
4. IMPACT
- Rows kept: 10,000 (A would have left 9,200).
- New column: income_missing.
- Risk if A-1 is wrong: blanks may really be zero income, which
would make filled values too high for those applicants.
- Check: on Day 6, compare default rate of income_missing = 1
versus 0; if very different, test a model with and without the flag.
- Code: clean.py, function fill_income()
How the two-minute audit works
A mentor does not need to rerun anything. They read in this order and can stop at the first failure:
- Is the observation numeric? Yes: 800 of 10,000, 62% self-employed.
- Are there real alternatives? Yes: three options, including dropping rows.
- Does the reason point to the evidence? Yes: it cites the self-employed concentration.
- Is the riskiest assumption named? Yes: A-1, with the consequence if wrong.
- Is there a dated check? Yes: Day 6, with a specific comparison.
- Can the code be found? Yes: file and function.
If all six pass, the decision is auditable. If one fails, the mentor knows precisely which line to ask about.
A 14-day plan for logging decisions in a short project
A two-week project leaves little room for long documentation, so tie the log to the project’s natural stages. The online internship from CareerSwami is free, runs for two weeks (14 days) and comes with a free offer letter and a free completion certificate after successful completion, so this schedule is built around that length. Adjust it if your own project timeline differs.
| Days | Project stage | Records to write | Typical count |
|---|---|---|---|
| 1-2 | Problem framing and data intake | Question definition, target definition, scope of rows and dates | 2-3 |
| 3-5 | Cleaning and exploration | Missing values, outliers, duplicates, type fixes | 3-4 |
| 6-8 | Features and split | Encoding, scaling, leakage checks, split method | 2-3 |
| 9-11 | Modelling and metrics | Baseline, model choice, metric choice, tuning limits | 2-3 |
| 12-13 | Review and reversals | Close open assumptions, mark reversed decisions | 1-2 |
| 14 | Summary | One-page index of all decisions linked to the final results | 1 page |
Ten to twelve good records are enough for a project this size. Writing fifty thin ones is worse than ten sharp ones.
The decision log index: one table that ties everything together
Keep a one-table index at the top of your log so a reader can scan before reading details.
| ID | Title | Status | Key assumption | Assumption checked? | Effect on result |
|---|---|---|---|---|---|
| D-01 | Define default as 90+ days overdue | Accepted | A-0: Label is reliable | Open | Sets class balance |
| D-03 | Fill income by job-category median | Accepted | A-1: Blank is not zero | Day 6 | Keeps 800 rows |
| D-05 | Time-based train/test split | Accepted | A-4: Future resembles recent past | Open | Lower but safer score |
| D-07 | Use recall as main metric | Reversed on Day 12 | A-5: Missing a defaulter costs more | Yes | Switched to F1 plus recall |
This table is illustrative too. Note that a reversed decision stays in the log. Showing that you changed your mind with a reason is a strength, not an embarrassment.
Documentation habits at SGGU: what is known and what to confirm
Shri Govind Guru University’s official homepage says it was established by the Government of Gujarat under Act No. 24/2015. A Wikipedia page, which is not an official source, describes it as a state university headquartered in Godhra, and says colleges in Panchmahals, Dahod, Mahisagar, Chhota Udepur and Vadodara (Rural) are affiliated with it, giving 286 affiliated colleges as of December 2024. Treat those details as a general description and check the current position yourself.
What this means in practice: if your college is one of the affiliated ones, your project or internship paperwork may come from the university’s common rules, from your own college, or from both. No verified source here confirms the university’s internship duration, credit, evaluation format, required documents or whether an online internship is accepted. Do not assume any of these.
This is where a decision log helps. Whatever format your college asks for, a decision log is evidence of your own reasoning and can sit alongside a report, a viva file or a portfolio. It does not replace anything the college requires, and CareerSwami is an independent guide, not connected to the university.
Steps to verify before you rely on this for coursework
- Ask your department coordinator or project guide in writing whether an online internship or self-directed data project can be submitted for any academic requirement, and whether your college or the university decides this.
- Request the current regulation or scheme document for your programme and semester, and look for sections on project work, internship or industrial training.
- Ask for the required report format and evaluation split, and whether a decision log can be attached as an appendix.
- Check with the training and placement or career cell, if your college has one, which documents they need, such as an offer letter or completion certificate.
- Confirm the submission deadline and the semester break dates from your college’s academic calendar before you plan a 14-day schedule.
- Keep the replies in writing, with the date and the name of the person who gave them.
Writing quality: how to make each field sharper
Context: always attach a number
“Many outliers” is not evidence. “142 of 10,000 rows have loan_amount above 5 times the 99th percentile” is. A number lets the reader judge whether your response was proportionate.
Options: include “do nothing”
Leaving the data as it is is a legitimate option. Listing it shows you considered whether the step was needed at all.
Choice: one reason, tied to the context
Limit yourself to one or two sentences. If the reason needs a paragraph, the decision is probably two decisions.
Impact: report before and after
Row counts, column counts and metric changes are all valid. If you cannot measure the impact yet, say so and write when you will.
Status: update it honestly
Mark records as Proposed, Accepted or Reversed. Never delete a reversed record; add a new one that references it.
Self-check scorecard for your decision log
Before sharing the log with a mentor, score each line 0 (absent), 1 (partly) or 2 (clearly present).
| Check | 0 | 1 | 2 |
|---|---|---|---|
| Every record has a numeric observation | None | Some | All |
| Assumptions are numbered and testable | None | Some | All |
| At least two options per record | Rare | Most | All |
| Reasons point back to evidence | Rare | Most | All |
| Impact shows before and after | Rare | Most | All |
| Checks have a day and a method | None | Some | All |
| Records link to code location | None | Some | All |
| Index table is current | Missing | Outdated | Current |
A total of 14 to 16 means the log is ready for review. Between 9 and 13, fix the lowest-scoring rows first. Below 9, the log is more of a diary than an audit trail, so rewrite the weakest records using the template above.
Where decision records go wrong in data projects
- Writing records after the fact. Memory invents tidy reasons. Write the record when you make the choice, even if it is rough.
- Recording only successes. The options you rejected, and why, are the most informative part.
- Leaving leakage unrecorded. If a feature could contain information from after the outcome, record how you checked.
- Burying assumptions. If an assumption sits in a paragraph, nobody will test it. Number it.
- Over-documenting trivia. Fifty records of minor edits hide the five that matter.
Frequently Asked Questions
How long should a single decision record be?
Between 10 and 20 lines is usually enough. If the record runs longer, it likely bundles several decisions and should be split so each can be audited separately.
Do I need a decision record for every cleaning step?
No. Record a step only when a reasonable alternative would change your numbers or conclusion. Routine fixes such as renaming columns or correcting obvious typos can be noted in code comments.
What is the difference between an assumption and a decision in a data project?
An assumption is something you treat as true without proof, such as “blank income means not reported”. A decision is a choice you make, such as filling those blanks with a median. Decisions rest on assumptions, so each should be written separately and the assumption given a check.
Should I keep decisions that I later reversed?
Yes. Mark the old record as Reversed and add a new one that references it. A visible reversal with a reason shows evidence-based thinking, which mentors generally value more than a spotless record.
Where should I store the decision log: notebook, document or repository?
Choose the place your mentor will actually open. A markdown file in the same folder as your code works well because it stays versioned with the project. A shared document also works if you link each record to the code location.
Can a decision log be part of my university project submission?
That depends on your college’s requirements, which this article cannot confirm. Ask your project guide in writing whether the log can be attached as an appendix, and request the current report format from your department.
How many decision records are reasonable for a two-week project?
Around ten to twelve well-written records usually cover a 14-day project: framing, cleaning, features, split, metric and model. Quality matters more than volume, so focus on choices that move the result.
Can I use the same template for a short online internship project?
Yes. The template is tool-independent and suits any short data project. Map the records to the 14-day plan above and keep the index table current so your mentor can review the whole project quickly.
Related Data Science guides
- Sikkim Skill University Students: Skill-Based Proof of Work for Data Science Internships
- University of Calicut Students: Balancing a Data Science Internship With Regular Classes
- MM University Students: Mock Technical Screening Round for a Data Science Internship
- All Data Science internship guides
Ready to put this into practice?
Join the free two-week CareerSwami online internship in Data Science. The internship, the offer letter and the completion certificate are free.